NEW PLASTER IS APPLIED WITH A QUARTZ FINISH AND POOL IS FILLED ON MAY 15TH.​​

THE MAIN POOL WAS RENOVATED IN THE SPRING OF 2016


FIRST THE DAMAGED SCUPPERS WERE REMOVED WITH JACKHAMMERS AND REPLACED               (APRIL 20-21)

BOND COAT IS APPLIED (MAY 16TH)

​CRACKS WERE SAW-CUT AND DAMAGED/COMPROMISED AREAS OF THE POOL SURFACE WERE REMOVED.  DAMAGED LANE LINE TILES WERE REMOVED AND REPLACED.        ​(MAY 16TH)

THEN THE OLD PAINT AND PLASTER WAS SANDBLASTED    (MAY 5-8)

(609) 653-9841


PO Box 303 Linwood NJ 08221

VIOLA!  POOL IS OPEN ON MAY 28TH!

THE COPING AND TILE WERE REMOVED, AND THE BEAM OF THE POOL REPAIRED  (MAY 10-12)